Search from thousands of Florida, Miami-Dade & other Engineering Plans. Search all at once, save, share, & monitor listings, all for free. Sign Up - Look inside Approval content with our DeepSearch reports - Learn More
1.) The design pressure limitation is for tile-roof installations only. Refer to NER Section 4.7.2 for details. 2.) Refer to NER Section 4 for Limits of Use.
Notes:
Date Submitted: December 14, 2023
Date Validated: December 14, 2023
Entity: NEMO CERT, LLC (Eval)
Compliance Method: Evaluation Report from a Product Evaluation Entity
Other: 1.) The design pressure limitation is for tile-roof installations only. Refer to NER Section 4.7.2 for details. 2.) Refer to NER Section 4 for Limits of Use.