Search from thousands of Florida, Miami-Dade & other Engineering Plans. Search all at once, save, share, & monitor listings, all for free. Sign Up - Look inside Approval content with our DeepSearch reports - Learn More
Mullion construction, pressure, assembly & installation requirements are to be as specified in the attached drawing No. 1973 & evaluation report WWS-359. Job required design wind pressure shall be calculated in accordance with the Florida Building Code Chapter 16 & ASCE 7 Minimum Design Loads for Buildings and Other Structures. This mullion system is rated as a wind zone 4 missile level "D" product.
Notes:
Date Submitted: April 3, 2020
Date Validated: April 3, 2020
Entity:
Compliance Method: Evaluation Report from a Florida Registered Architect or a Licensed Florida Professional Engineer
Other: Mullion construction, pressure, assembly & installation requirements are to be as specified in the attached drawing No. 1973 & evaluation report WWS-359. Job required design wind pressure shall be calculated in accordance with the Florida Building Code Chapter 16 & ASCE 7 Minimum Design Loads for Buildings and Other Structures. This mullion system is rated as a wind zone 4 missile level "D" product.