Search from thousands of Florida, Miami-Dade & other Engineering Plans. Search all at once, save, share, & monitor listings, all for free. Sign Up - Look inside Approval content with our DeepSearch reports - Learn More
For non-HVHZ, see manufacturers installation instructions and FBC Table 1507.1.1. In the HVHZ, see manufacturer's instructions and 1518.3. In the HVHZ, only for use with Metal Roofing, Wood Shakes & Shingles, and Asphalt Shingles. Maximum exposure is 30 days.
Notes:
Date Submitted: June 19, 2018
Date Validated: June 19, 2018
Entity:
Compliance Method: Test Report
Other: For non-HVHZ, see manufacturers installation instructions and FBC Table 1507.1.1. In the HVHZ, see manufacturer's instructions and 1518.3. In the HVHZ, only for use with Metal Roofing, Wood Shakes & Shingles, and Asphalt Shingles. Maximum exposure is 30 days.