Search from thousands of Florida, Miami-Dade & other Engineering Plans. Search all at once, save, share, & monitor listings, all for free. Sign Up - Look inside Approval content with our DeepSearch reports - Learn More
See applicable UL construction number for allowable uplift loads. 1/4:12 minimum roof slope in Non-HVHZ areas. Not to be used as a diaphragm. Install per UL 216 construction number.
Notes:
Date Submitted: August 25, 2017
Date Validated: September 14, 2017
Entity: UL LLC
Compliance Method: Certification Mark or Listing
Other: See applicable UL construction number for allowable uplift loads. 1/4:12 minimum roof slope in Non-HVHZ areas. Not to be used as a diaphragm. Install per UL 216 construction number.
Official Site Status: Approved
Subcategory: Metal Roofing
Contact Information
Representative:
Mike Boland
Address:
308 Connecticut Drive, Burlington, New Jersey 08016 USA