Search from thousands of Florida, Miami-Dade & other Engineering Plans. Search all at once, save, share, & monitor listings, all for free. Sign Up - Look inside Approval content with our DeepSearch reports - Learn More
CSI Code: 08 01 60 - Operation and Maintenance of Skylights and Roof Windows
CSI Code: 08 63 00 - Metal-Framed Skylights
Other:
Anchors 7" from each end & 12" OC at frame jambs. Frame head & sill anchored 12" from each end and one (1) at center. Anchors are attached to buck with two (2), #14-10 x 1" HW-SMS 18-8A and attached to frame with (1) #-16x1" PL-PH-SMS tek screw. Glass: See Glazing Details.PDF for details.
Notes:
Date Submitted: June 15, 2018
Date Validated: June 29, 2018
Entity:
Compliance Method: Test Report
Other: Anchors 7" from each end & 12" OC at frame jambs. Frame head & sill anchored 12" from each end and one (1) at center. Anchors are attached to buck with two (2), #14-10 x 1" HW-SMS 18-8A and attached to frame with (1) #-16x1" PL-PH-SMS tek screw. Glass: See Glazing Details.PDF for details.