FL27018.1-R2

Report Status
Approved
Code Version
2023 Florida Building Code
Application Type
Revision
Folio:
Model:

SERIES POINT SUPPORT SPIDER WALL SYSTEM - LMI

Database:
Florida Product Approval
Source Link:
Description:

SERIES POINT SUPPORT SPIDER WALL SYSTEM - LMI

Listing Details
Category:
Storefront Curtainwall & Cladding
Subcategory:
Curtain Walls
Evaluator:
Yiping Wang - PE-55983
Validator:
Xiaojun Gu
Official Site Status:
Approved
Compliance Method:
Evaluation Report from a Florida Registered Architect or a Licensed Florida Professional Engineer
Approval Method:
Method 1 Option D
Entity:
 
Specifications
Submission Date:
December 4, 2023
Validation Date:
December 28, 2023
HVHZ Approved:
Yes
Impact Resistant:
Yes [FL]
Design Pressures:
-69psf / +82psf
Possible CSI Codes:
CSI Code: 08 44 26.13 - Glass Framed Point Supported Glass Curtain Walls
CSI Code: 08 44 26.16 - Metal Framed Point Supported Glass Curtain Walls
CSI Code: 08 44 26.23 - Cable Framed Point Supported Glass Curtain Walls
CSI Code: 08 44 26 - Structural Glass Curtain Walls
CSI Code: 11 61 33.19 - Curtain Systems
Other:
For Window Sizes Vs. Design Pressure refer to Installation Instructions.
Notes:


Date Submitted: December 4, 2023

Date Validated: December 28, 2023

Entity:  

Compliance Method: Evaluation Report from a Florida Registered Architect or a Licensed Florida Professional Engineer

Other: For Window Sizes Vs. Design Pressure refer to Installation Instructions.

Official Site Status: Approved

Subcategory: Curtain Walls
Contact Information
Representative:
Quincy Brown
Address:
325 West 74th Place,
Hialeah, Florida 33014
Search the National Fenestration Rating Council
(NFRC) for Energy Efficiency information

Read, ask experts, & comment on this topic. All for free.

Latest Posts From This Product Category

Ask The Circle
Listing Changes
Last Synced: 09/14/2025
Change Log effective March 1st 2023
Please sign in or create an account to view listing changes
Approval & Installation Documents
PR INSTL DOCS FL27018 R2 II 2020.10.14 - AD18-03 - POINT SUPPORT SPIDER WALL - LMI AND SMI - SS
PR INSTL DOCS FL27018 R2 II 2020.10.14 - AD18-03 - POINT SUPPORT SPIDER WALL - LMI AND SMI - SS
PR INSTL DOCS FL27018 R2 II POINT SUPPORT SPIDER WALL - LMI AND SMI AD18-03 FL27018 REV 12.19.2023 SS
PR INSTL DOCS FL27018 R2 II POINT SUPPORT SPIDER WALL - LMI AND SMI AD18-03 FL27018 REV 12.19.2023 SS
PR TECH DOCS FL27018 R2 AE EVALUATION REPORT FBC 2023 SS
PR TECH DOCS FL27018 R2 AE EVALUATION REPORT FBC 2023 SS
QR Code To This Listing
FL27018.1-R2 Listing QR Code
Shopping Cart