Search from thousands of Florida, Miami-Dade & other Engineering Plans. Search all at once, save, share, & monitor listings, all for free. Sign Up - Look inside Approval content with our DeepSearch reports - Learn More
Uplift Load for 20" wide panel w/two screws per clip: 6" o/c -99.3 PSF, 12" o/c -89.3 PSF, 18" o/c -79.3 PSF, 24" o/c -69.3 PSF. Install per manufacturer's details. Not for use in HVHZ.
Notes:
Date Submitted: March 24, 2022
Date Validated: April 1, 2022
Entity:
Compliance Method: Test Report
Other: Uplift Load for 20" wide panel w/two screws per clip: 6" o/c -99.3 PSF, 12" o/c -89.3 PSF, 18" o/c -79.3 PSF, 24" o/c -69.3 PSF. Install per manufacturer's details. Not for use in HVHZ.
Official Site Status: Approved
Subcategory: Metal Roofing
Contact Information
Representative:
Nicholas Delfino
Address:
102 Northpoint Parkway Building 106, Acworth, Georgia 30102 USA