Search from thousands of Florida, Miami-Dade & other Engineering Plans. Search all at once, save, share, & monitor listings, all for free. Sign Up - Look inside Approval content with our DeepSearch reports - Learn More
Zone 4, Level E, LMI. Curtain wall size, pressure, assembly and installation per the attached test report and test unit drawings. Project wind pressures shall be calculated per the Florida Building Code Chapter 16 and ASCE 7. Glass meets the requirements of ASTM E1300 standard.
Notes:
Date Submitted: October 19, 2020
Date Validated: October 19, 2020
Entity:
Compliance Method: Test Report
Other: Zone 4, Level E, LMI. Curtain wall size, pressure, assembly and installation per the attached test report and test unit drawings. Project wind pressures shall be calculated per the Florida Building Code Chapter 16 and ASCE 7. Glass meets the requirements of ASTM E1300 standard.