Engineering Plans: Articles
Browse Our Articles
Quick Links:
Search Articles:
Filter Articles By:
- All
- Approval Info
- Build A House Series
- Design
- Doors
- Fences
- Gates
- General
- House
- Pergolas
- Railings
- Sheds
- Sunrooms
- Technical
- Windows
- All
- Approval Info
- Build A House Series
- Design
- Doors
- Fences
- Gates
- General
- House
- Pergolas
- Railings
- Sheds
- Sunrooms
- Technical
- Windows
Product Approval Tracking Help Page
Use the tracking system to be notified for events such as: For New Approval Listings All product listings as they …
What’s the allowable aspect ratio of fixed impact glass in the HVHZ?
Often times a glazing product is approved for large missile impact, but requires a field modification for size. While the …
About the impact rating standard in the Florida Product Approval Database
In the state of Florida’s product approval website, there’s a setting called ‘impact’. This setting relates to the large missile …
How do I get a Florida Product Approval for my building product?
The easiest way to engage with the Florida Product Approval System is to retain a design professional experienced in this …
What defines an alternative material & design method of construction?
The Florida Building Code Section 104.11 (2020) defines the procedure and design methodology for alternative materials used in construction. This …
What is a Florida Local Product Approval And How Is It Used?
Florida has adopted a Local Product Approval System that governs the submission & use of of statewide product approvals. That’s …
Is a Florida Product Approval Mandatory For Permit?
Florida Statewide Product Approvals are an optional requirement for permit in Florida. Products within the rule of the Florida Product …
Where can I find more technical information about Product Approvals?
Engineering Express maintains a database of technical questions relating to product approvals. Click Here to visit their knowledge base. Questions …
How long does it normally take for a building product to be State approved?
The product approval process can take up to 60 days or more depending on the review process (i.e., two months …